The production process of glass bottles

The glass bottle production line generally consists of a spray booth, a hanging chain, and an oven. There is also the pre-treatment of water, which requires special attention to the issue of sewage discharge. As for the quality of glass bottles, it is related to water treatment, surface cleaning of workpieces, conductivity of hooks, gas volume, amount of powder sprayed, and the level of operators.

 

The key points to pay attention to on the spray bottle production line are: 1. the quality of the powder itself 2: The temperature of the oven 3: Baking time 4: Whether the spray is in place.

 

1. Pre processing section. The pre-treatment section includes pre stripping, main stripping, surface adjustment, etc. If it is in the north, the temperature of the main stripping section should not be too low and insulation is required. Otherwise, the treatment effect will not be ideal;

 

2. Preheating section. After pre-treatment, it is necessary to enter the preheating section, which usually takes 8-10 minutes. It is best to leave a certain amount of residual heat on the sprayed workpiece when it reaches the powder spraying room to increase the adhesion of the powder;

 

3. Soot blowing purification section. If the process requirements of the sprayed workpiece are relatively high, this section is essential. Otherwise, if there is a lot of dust adsorbed on the workpiece, there will be many particles on the surface of the processed workpiece, which will reduce the quality;

 

4. The wine bottle tells about the powder spraying section. The most crucial issue in this paragraph is the technical skills of the powder sprayer. If you want to create high-quality spray bottles, it is still very cost-effective to spend money on skilled technicians;

 

5. Drying section. What should be noted in this paragraph is the temperature and baking time. Generally, 180-200 degrees Celsius is preferred for powders, depending on the material of the workpiece. Also, the drying oven should not be too far from the powder spraying room, usually 6 meters is better.